Cotton

Fire Protech Co. Ltd.
with human, nature, and technology

Interior closing materials

Installation methods

We will lead the global market with technology development and management innovation.

STEP 01
Cleaning floor side
  • After wall cleaning, heavy uneven parts are adjusted evenly to maintain smoothness.
STEP 02
Installation of plaster board (veneer)
  • Install plaster board (veneer) firmly to maintain smoothness, if necessary
STEP 03
Installation of cotton board
  • After sintering about 2 – 3 minutes upon sufficient application of adhesive on the back of cotton board, attach it closely not to occur the gap to meet the joints.
  • Using stapler or tacker gun, fix it upon nailing over 10 places.