Construction methods
Fungi due to internal condensation are not occurred using additional
insulating materials such as bead foam, etc. whose raw materials are organic ones.
![특장점](/images/content/img_zero_photo0106.jpg)
- STEP 01
-
Cleaning floor side
- Eliminate and clear the dust, foreign substances, etc. on the floor side with brush or cloth.
- STEP 02
-
Working after drying
- Construction is performed at the complete dried state.
- STEP 03
-
Plastering or spray coat
- Even construction with 5 mm thickness by plastering or spray coat, and can reapply with required thickness.
- STEP 04
-
Completion of construction
- In case of maintenance construction, construct Zero-DewⓇ after even application of specialized primer undercoat, Primer Zero-DewⓇ by brush or roller.
Cautions
- Do not use it upon mixing with other product.
- In case of damp area for construction, start work after drying.
- Store the product at the dry, cool, and dark place avoiding direct ray at room temperature (5~35℃).
- In case of storing in winter, be cautious not to be frozen.
- Store the opened product after complete sealing.